The Government of Mozambique has received financing from the World Bank toward the cost of the Mozambique Land Administration Project (Terra Segura) and intends to apply part of the proceeds toward payments under the contract for Delimitation of communities and basic land use planning and land regularization, parcels demarcation, boundaries survey, preparation and issuance of individual Rights of Use and Benefit from Land Titles (DUATs).

The National Fund for Sustainable Development (Fundo Nacional de Desenvolvimento Sustentável - FNDS) now invites sealed bids from eligible Bidders for the Provision of Non-Consulting Services for Community Delimitation and Basic Land Use Planning and Land Regularization, Parcel Demarcation, Boundaries Survey, Preparation and Issuance of DUATs.

The services are for the conduct of a systematic land regularization process with three components, namely i) Component 1: Mobilization, Preparation, Public Information and Awareness Campaign and Social Preparedness; ii) Component 2: Delimitation, Mapping and Registration of Areas Occupied by Communities (DELCOM); iii) Component 3: Systematic Identification, Demarcation, Measurement and Documentation of Individual Rights of Use and Benefit from Land (DUATs). Under this bidding document, Phase I of the land regularization process will occur as described under Component 2 Systematic Land Regularization, Sub-component 2.3 Community delimitation (DELCOM) and regularization of land use rights (LTR) of the MozLand (Terra Segura) Project, which covers LOTs 1, 2, and 3 as described in Appendix A of this document.

Each LOT consists of 200,000 DUATs and 120 Communities. The deliverables are required within a period of 17 months.

Please follow the link to see the Full Annoucement and the Full Request for Bids..

Other important documents can be consulted if needed: DELCOM and RDUAT Methodology (Portuguese) Land Registration Procedures for Local and National Communities over 10 years (Portuguese)

Addendum_DelcomRduat_#1(29072020)

Clarifications_DelcomRduat_Phase_I_#1(29072020)

Clarifications_DelcomRduat_Phase_I_#2(29072020)

Addendum_2_Cleared_20082020

Clarifications to Bidders 3 -Delcom_LTR Phase 1_Cleared_20082020

ESF Safeguards Interim Note on COVID-19

Addendum_3_Cleared_25082020

Clarifications to Bidders # 4 -Delcom_LTR Phase 1_Cleared_25082020

Please click here to watch the opening of BIDs live

FaLang translation system by Faboba

Conheça mais sobre o SUSTENTA
Projecto de Gestão Integrada de Agricultura e Recursos Naturais

play
Assista o video institucional do projecto

Criação e Implementação: DotCom